VMware Technical Migration Guides
These guides identify common technical workstreams that should be tested against a representative workload inventory before production cutover.
Independent research
Technical planning guides for VMware VM conversion, KVM, vSAN, vTPM, encryption, NSX, backup, DR, and snapshots.
These guides identify common technical workstreams that should be tested against a representative workload inventory before production cutover.
September 2, 2026
Plan and validate VMDK to QCOW2 conversion, including snapshots, disk consistency, guest drivers, and post-conversion testing.
Read analysisSeptember 2, 2026
Plan backup and restore continuity when migrating VMware workloads, including retention, immutability, monitoring, and restore testing.
Read analysisSeptember 2, 2026
Plan disaster recovery continuity through VMware migration, including RTO/RPO, runbooks, replica data, failover, and recovery testing.
Read analysisSeptember 2, 2026
Plan encrypted VMware workload migration with key custody, decryption workflow, access controls, audit evidence, and recovery testing.
Read analysisSeptember 2, 2026
Plan NSX migration through network discovery, policy translation, segmentation, load balancing, security validation, and staged cutover.
Read analysisSeptember 2, 2026
Assess VMware snapshots before migration: consolidation, application consistency, disk space, rollback, and conversion readiness.
Read analysisSeptember 2, 2026
Technical planning steps for VMware to KVM migration: inventory, conversion, virtual hardware, guest validation, and cutover.
Read analysisSeptember 2, 2026
Plan vSAN-backed workload migration with data movement, storage policy, capacity, resiliency, and validation considerations.
Read analysisSeptember 2, 2026
Assess vTPM-dependent VMware workloads before migration, including encryption, key management, guest readiness, and recovery validation.
Read analysis